Verity helped in the construction of this data center located in Hillsboro, Oregon. This center had 4 computer rooms of 6 MW each to make 3 electrical distributions. With the construction, there was also an addition of a 3 MW diesel engine generator back up with local belly tank fuel storage. Verity’s construction management also involved a dry type of STS/PDU, air cooled chiller, a 35% glycol loop, computer room air handlers, 2 MMR’s, double interlock pre-action sprinklers, and a VESDA smoke detection.