https://www.veritycommercial.com/wp-content/uploads/2020/04/9800-developmentfront.jpg

9800 Medical Center Drive Laboratory

This phased project expands Alexandria Real Estate Equities’ health science campus at 9800 Medical Center Drive in the Maryland I-270 Biotech corridor. The project contains wet laboratories and a significant addition to the Shady Grove Life Sciences Center which includes Shady Grove Adventist Hospital, Johns Hopkins University and NIH National Cancer Institute.

Intercell Smart Vaccines

Verity worked with Intercell throughout their entire business cycle, from young start-up through acquisition and ultimately facility disposition. We provided tenant representation and construction management services, advising on their growth from 5,000- to 75,000-sf in a two-building campus. The growth phasing included corporate offices, laboratories, and two cGMP manufacturing facilities. In early 2011, Intercell’s European… Read More

9800 Medical Center Drive Parking Garage

The 6-level precast concrete parking structure was built as part of a phased laboratory facility project to expand Alexandria Real Estate Equities’ health science campus at 9800 Medical Center Drive in the Maryland I-270 Bio-tech corridor. It contains 748 parking spaces including spaces for bicycles and motorcycles and 2 elevators and 2 stairways to provide… Read More

Pharmaron Baltimore

Verity provided pre-construction services including contract negotiations with the architect and general contractor. In addition, Verity coordinated with the tenant leadership team to assemble a phasing plan/moving plan that enabled the tenant to remain operational during construction of this multi-floor renovation. Additional services offered were coordination with the landlord and assistance with lease negotiations. Verity’s… Read More

Pharmaron Germantown

Pharmaron is a premier R&D service company supporting the life science industry. Founded in 2003, Pharmaron provides diverse drug R&D service capabilities. This project is an 18,080-sf build-to-suit expansion of Pharmaron/Xceleron’s facilities in Gaithersburg, MD. The work consisted of converting a flex office space originally built in 2006 into a fully functional office/ laboratory space…. Read More